Shop TE CONNECTIVITY

PCB, PCB Relay, 1 A, Long Lead

  • Mfr # 1617139-3
  • Zoro # G600973299

product price: 
$
75.45
/ea
Sold in multiples of 3 for $226.35

Key Features

Mounting Style
PCB
Electrical Connection
Long Lead
Coil Voltage
26.5V DC
Current Rating
1 A
Contact Form
DPDT
See all product information
Unlock 30-day payment terms
Unlock 30-day payment terms
Business customers can apply for Net 30—no fees, no interest, fast approval. Terms apply.
Create Account
Get 10% off your order
Get 10% off your order
Sign up for our email list and receive your promo code via email.

Specifications

Product Information

MFR #
1617139-3
Zoro #
G600973299
UPC #
-
Country of Origin
India

Details

Item
General Purpose Signal Relay
Mounting Style
PCB
Electrical Connection
Long Lead
Coil Voltage
26.5V DC
Current Rating
1 A
Contact Form
DPDT
Coil Polarity Protection Diode
Without
Contact Current Rating
1A
Transistor Driver
Without
Contact Current Class
Low Level to 1 A
Coil Resistance
1560 Ω
Actuating System
DC
Coil Suppression Diode
With
Input Voltage
26.5 VDC
Coil Magnetic System
Non-Polarized, Monostable
Vibration
30G's, 10 to 3000Hz
MOSFET Driver
Without
Enclosure Type
Hermetically Sealed
Relay Type
Military/Aerospace High Performance
Contact Arrangement
2 Form C, DPDT, 2 C/O
Operating Temperature Range
-65 to 125°C
Shock
75G's, 6ms
Coil Power Rating (DC)
450 mW
Contact Rating (DC)
1 A @ 28V
Number of Pins
8

Ratings & reviews

3 reasons you can count on us

  • Supplies for every job.

    13 million items and the exact one you need.

  • When you need it fast, count on Zoro!

    4.5 million products ship in 1 day.

  • Stretch your budget further.

    Everyday low prices on the brands you love.