Shop TE CONNECTIVITY

PCB, Power Relay, 1 A, Long Lead

  • Mfr # 1617108-8
  • Zoro # G700973823

product price: 
$
96.15
/ea

Key Features

Mounting Style
PCB
Electrical Connection
Long Lead
Coil Voltage
12V DC
Current Rating
1 A
Actuating System
DC
See all product information
Unlock 30-day payment terms
Unlock 30-day payment terms
Business customers can apply for Net 30—no fees, no interest, fast approval. Terms apply.
Create Account
Get 10% off your order
Get 10% off your order
Sign up for our email list and receive your promo code via email.

Specifications

Details

MFR #
1617108-8
Zoro #
G700973823
UPC #
-
Country of Origin
India
Item
General Purpose Signal Relay
Mounting Style
PCB
Electrical Connection
Long Lead
Coil Voltage
12V DC
Current Rating
1 A
Actuating System
DC
Coil Polarity Protection Diode
Without
Relay Type
Military/Aerospace High Performance
Contact Current Class
Low Level to 1 A
Shock
30G's, 6ms
Pin Configuration
.2 x .3" Spreader Pad
Operating Temperature Range
-55 to 85°C
MOSFET Driver
Without
Coil Resistance
390 Ω
Coil Power Rating (DC)
369 mW
Coil Suppression Diode
Without
Vibration
10G's, 10 to 500Hz
Coil Magnetic System
Non-Polarized, Monostable
Enclosure Type
Hermetically Sealed
Transistor Driver
Without
Contact Arrangement
2 Form C, DPDT, 2 C/O
Input Voltage
12 VDC
Contact Current Rating
1A
Contact Rating (AC)
250 mA @ 115V, 100 mA @ 115V
Contact Rating (DC)
1 A @ 28V
Contact Form
DPDT

Ratings & reviews

3 reasons you can count on us

  • Supplies for every job.

    13 million items and the exact one you need.

  • When you need it fast, count on Zoro!

    4.5 million products ship in 1 day.

  • Stretch your budget further.

    Everyday low prices on the brands you love.