Zoro Homepage
Clipboard Icon Quick Order Cart Icon 0 Cart

CPVC Transition Compression Union, Schedule SDR-11, 3/4" Pipe Size, Compression x CTS Hub

  • Mfr # TUC-007

  • Zoro # G1692923


product price: $22.49
/ea

Key Features

Fitting Connection Type
Compression x CTS Hub
Pipe Fitting Material
CPVC
Basic Pipe Fitting Shape
Union
Fitting Schedule/Class
Schedule SDR-11
Pipe Size - Pipe Fitting
3/4"
See all product information
Get a 10% off coupon
Free 30-day returns
Return Policy
Get 30 days to pay with Net 30
Apply Now
Real support from real people
Contact our U.S. based team

Specifications

Product Information

MFR #
TUC-007
Zoro #
G1692923
UPC #
-
Country of Origin
United States

Dimensions

Pipe Size - Pipe Fitting
3/4"
Pipe Size (Fittings)
3/4"
Plastic Side Nominal Pipe Size
3/4 in
Overall Length
3 5/16 in
Metal Side Nominal Pipe Size
3/4 in
Hex Size
1 7/16 in

Details

Fitting Connection Type
Compression x CTS Hub
Pipe Fitting Material
CPVC
Basic Pipe Fitting Shape
Union
Fitting Schedule/Class
Schedule SDR-11
Item
Transition Compression Union
Standards
ASTM D2846
Pipe Fitting Schedule/Class
Schedule SDR-11
Specific Pipe Fitting Shape
Transition Compression Union
Color
Tan
Basic Pipe Fitting Material
Plastic
Max. Temp.
180 Degrees F
Specific Fitting Shape
Transition Compression Union
Temp. Range
40 Degrees to 180 Degrees F
For Pipe Schedule
Schedule SDR 11
Metal Side Material
Brass
Low Lead Certified Standards
NSF 14/61
Maximum Operating Pressure
100 psi
Plastic Side Gender
Male
Schedule
Schedule SDR 11
Non-Threaded Insert Material
CPVC
Threaded Insert Material
Brass
Low Lead Compliance Level
Certified
Plastic Side Type
Spigot
Metal Side Type
Compression
Application
Non-Potable Water
Metal Side Gender
Male

Description

Transition Union, 3/4 in Metal Side Nominal Pipe Size, Brass Metal Side Material, Male Metal Side Gender, Compression Metal Side Type, 3/4 in Plastic Side Nominal Pipe Size, CPVC Non-Threaded Insert Material, Male Plastic Side Gender, Spigot Plastic Side Type, Threaded Insert Material Brass, Schedule SDR 11, For Pipe Schedule Schedule SDR 11, 100 psi Maximum Operating Pressure

Restrictions

Ratings & Reviews

3 Reasons You Can Count On Us

  • Supplies for every job.

    Supplies for every job.

    10 million items and the exact one you need.

  • When you need it fast, count on Zoro!

    When you need it fast, count on Zoro!

    2 million products ship in 1 day.

  • Stretch your budget further.

    Stretch your budget further.

    Everyday low prices on the brands you love.